Data Center Logistics, Migration, and Relocation
Receiving, staging, transport, re-racking, and power-up sequenced so dependencies come online before the systems that rely on them.
Overview
A migration fails on sequencing more often than on transport. Gear arrives, but the switch that everything depends on is on the second truck, and the team spends the window waiting instead of cutting over.
​
We plan the move against your dependency order. Racks are surveyed and labeled before anything is unbolted, equipment is transported in a manner appropriate to its fragility and value, and the destination is brought up in the order your engineers specified, not in the order it happened to come off the pallet.
What's included
Pre-move survey and rack elevation documentation
Delivery receiving, inventory, and staging ahead of an install date
Labeling and cable capture before teardown
Deracking, packing, and protective crating
Transport between facilities or within a campus
Receiving and staging at origin or destination
Cabling and cross-connect rebuild at the destination
Debris and packaging removal
What you receive
Deliverable
A move plan showing sequence, timing, and rack elevations
Deliverable
An inventory reconciled at both ends.
Deliverable
Photo documentation of the destination build
Deliverable
A punch list closed out with your team before we release the space
Engage us when
You're migrating between facilities and the cutover window is fixed
Equipment is moving between rooms, rows, or cages on the same campus
Gear is arriving ahead of an install and needs receiving, inventorying, and staging
Your team will do the cutover but needs the physical build ready when they arrive