top of page
Fiber Splicing and Testing

Fiber Optic Splicing, Termination, and Certification

Fusion splicing, connector termination, and Tier 1 and Tier 2 testing for single-mode and multimode plant, with results documented and handed over.

Overview

Fiber either meets the loss budget or it doesn't, and the only way to know is to test it and show the numbers. We splice, terminate, and certify, then hand you the trace files, not a verbal assurance that it looked fine.

​

Work covers new runs, cross-connects, and emergency repair on damaged plant. Every connector is inspected and cleaned under a scope before it mates, because contamination causes more link failures than bad splices do.

What's included

Fusion splicing, single-mode (OS2) and multimode (OM3/OM4/OM5)
Ribbon and mass fusion splicing for high-count cable
Pigtail splicing into fiber enclosures and splice trays
Field connector termination
​Splice case and enclosure installation and re-entry
Cross-connects and meet-me room fiber
Break-fix and emergency restoration on damaged plant
End-face inspection and cleaning to IEC 61300-3-35 before every mate
Tier 1 certification - insertion loss testing against the design loss budget
Tier 2 certification - OTDR traces, bidirectional where the link warrants it

What you receive

Deliverable

Insertion loss results per link, tested against a stated loss budget

Deliverable

OTDR traces in native format plus a readable PDF summary

Deliverable

​End-face inspection records where required

Deliverable

A splice schedule showing fiber assignments and tray positions

Engage us when

New fiber has to pass certification before it goes into service
A cross-connect needs building between cages or into the meet-me room
A link is degraded or dark and you need it located and repaired
You've inherited plant with no test records and need a baseline

Fiber Optic Splicing, Termination, and Certification. Ready for what comes next.